Will it be rooftop waterproofing even in winter?

Should you postpone waterproofing in winter? Shinan Hyundai Apartment 5,661 ㎡, Gimcheon City Hall 1,097 ㎡ 3 days, etc. As the site was constructed by Owellsteel from December to February, we have summarized the reasons why winter rooftop waterproofing is possible and points to check before construction.

Will it be rooftop waterproofing even in winter?

On January 5, 2021, construction began on the rooftop of Shinan Hyundai Apartment.


It was the coldest time of the year, and the roof to be waterproof was 5,661 ㎡ .

The construction, ordered by the


Resident Representative Meeting, did not wait for the   spring and finished on February 4, .

 

신안 현대아파트 옥상 — 시공 전

Shinan Hyundai Apartment Pre-construction — Rooftop with worn urethane and rainwater

신안 현대아파트 옥상 — 시공 후

After the construction of Shinan Hyundai Apartment — Closed 5,661 ㎡ during the month of January

 

It's not just about this site.


Owellsteel On the homepage portfolio, Site where construction began between December and February Lee   There are several places up to the apartment, government offices, factories, and performance venues.


Is it possible to waterproof the rooftop in winter?   Based on these sites, we have outlined what should be checked if at all possible.

 

Why we postpone waterproofing to spring in winter

 

In the

waterproofing industry, the "No waterproofing in winter" has been through horses for a long time.


This horse is not wrong based on painted and hardened waterproof .

 

  • coatings do not harden well
    Paint waterproofing materials such as urethane can cause curing to slow down if the temperature is low and remain defective without properly hardening.
  • based water becomes a problem
    If frost and snow melt water are painted on the remaining base, the adhesion is weakened and it is easy to swell later.
  • Once painted does not end
    I have to paint multiple layers and wait for each layer to harden, so the construction period will be longer after a cold day.

 

겨울철 공정 비교 — 도막 방수와 조립식 스틸방수

Comparison of

winter process — coating waterproofing has to wait for each layer to harden, but prefabricated assemble the finished panel

 

So even if there is a leak in winter, "Let's do it in spring" often postpones construction.

 

The problem with

is that the leakage doesn't stop in between.


Sminned water in the cracks freezes and increases in volume, spreading the cracks further,   Whenever the accumulated snow melts, water enters the same spot.

 

What's different about

prefabricated steel waterproofing

 

ROOFGUARD is a rooftop assembly of factory-made steel panels.


There is no process waiting for the
film to harden, as it is not a painted film at the   site, but a finished and incoming panel.


The existing waterproof layer is also constructed on top of it without removing it.

 

방수패널을 내려놓아 조립하는 모습

Factory-made waterproof panel is put down on the roof and assembled.

 

교차점에 중간브라켓을 고정하는 모습

Place middle bracket at intersection with

panel and secure with nut

 

Of course, winter doesn't mean you can't work on it any day.

Since
panel fittings use silicon and primer at the bottom of the wall, recommends resting from work and rescheduling on snowy, rainy, or severe cold days.


And after finishing the construction, Refrain from using the rooftop so that the silicone hardens for about 7 days of the environments.


If you factor those two things into your schedule,   Winter can also be constructed without being too different from other seasons.

 

Sites constructed in the middle of winter

 

Xuanzang Use Water-proof area Conventional waterproof layer Construction Period
Shinan Hyundai Apartment Condominium 5,661 ㎡ urethane coating 2021.1.5 ~ 2.4
Gimcheon City Hall Business Facility 1,097 ㎡ Pressed Concrete January 7, 2020 - January 1, 2020.9
vow Factory 990 ㎡ urethane coating Feb.1-2.6, 2019
Daepoong Industrial Complex Public Wastewater Treatment Facility Resource Circulation Facility 864 ㎡ urethane coating 2023.12.8 ~ 12.15
Yeoju Public Postpartum Culinary Center Neighborhood Living Facility 802 ㎡ Pressed Concrete 2026.2.24 ~ 2.26
Voice Group School Food Support Center Neighborhood Living Facility 683.04 ㎡ Combined Sheet 2025.2.4 ~ 2.28
Daegu Opera House (stage area) Culture · Assembly Facility 626.2 ㎡ urethane coating 2025.12.3 ~ 12.5
Young Dream House, Sangju-si Business Facility 451.8 ㎡ Pressed Concrete 2025.2.14 ~ 2.18
Hyundai Mifo Apartment Condominium 208 ㎡ urethane coating 2023.12.29 ~ 2024.1.2
Sihwa Plant Factory 203.6 ㎡ urethane coating 2024.1.20 ~ 2.3
Asan City Living Resource Treatment Plant Resource Circulation Facility 164 ㎡ Pressed Concrete 2025.12.10 ~ 12.11

Owellsteel website portfolio standard, some of the sites that started construction in December-February. The construction period covers the entire site schedule.

 

building types and existing waterproof layers are unique.

Let's take a look at some
pictures.

 

Gimcheon City Hall — January, 1,097 ㎡ in three days

 

From 7 to 9 January 2020,   Gimcheon City Hall Rooftop 1,097 ㎡ in three days Closed.

 

The existing waterproof layer was covered with a green coating on the pressed concrete.   There was a long steel awning structure above the rooftop.


The structure was left intact, with panels underneath and around it.

 

김천시청 옥상 — 시공 전

— Wrapped rooftop under awning structure before Gimcheon City Hall construction

김천시청 옥상 — 시공 후

After Gimcheon City Hall construction, — closed 1,097 ㎡ for three days in January

 

Daegu Opera House — December, the stage area of the venue

 

From December 3 to 5, 2025,   Daegu Opera House Stage Area Rooftop 626.2 ㎡ was constructed.

Leaking water on the stage of
venue directly damages the performance and equipment.


Cracked and excited urethane rooftop covered with panel after three days of .

 

대구 오페라하우스 무대구역 옥상 — 시공 전

Daegu Opera House Stage Area Before Construction — Split and Exciting Urethane Rooftop

대구 오페라하우스 무대구역 옥상 — 시공 후

After construction of Daegu Opera House stage area, — finished 626.2 ㎡ in three days

 

Hyundai Mipo Apartment — Five Days Over the Sun

 

Hyundai Mipo Apartment Beginning on December 29, 2023, and ending on January 2, 2024, It was construction.


It was a holiday weekend, but the construction was completed in five days according to the weather.

 

현대 미포아파트 옥상 — 시공 전

Before construction of Hyundai Mifo Apartment — Green Urethane Rooftop

현대 미포아파트 옥상 — 시공 후

After construction of Hyundai Mifo Apartment

 

Sihwa Plant — In January, a factory rooftop lined with facilities

 

Sihwa Plant From January 20 to February 3, 2024 It was constructed.


There were steel fixtures lined up on one side of the rooftop.   The appliance has been finished by aligning the panels along the perimeter without moving them.

 

시화공장 옥상 — 시공 전

Before construction at Sihwa Plant — Urethane Paint Rooftop

시화공장 옥상 — 시공 후

After the construction of the

sihwa factory, the — facility is left intact and the finish is

.

 

Cold-resistant waterproof layer or

 

winter construction is possible,   its waterproof layer endures winter is a different story.

The


ROOFGUARD waterproof panel has undergone the following tests in accordance with KS standards:

 

  • Pitcher's test after low-temperature treatment
    Water did not seep in after 168 hours of treatment at minus 20°C.
  • Freeze-thawing Pitcher's test after 300 cycles
    After 300 cycles of freezing and melting, water did not seep in.
  • Conjugation performance test after repetition of extreme temperature
    The bonding performance of the joint was confirmed even after processing between 140 ℃ and minus 30 ℃.

 

루프가드 방수패널 저온·동결융해 시험 결과

COLD TEMPERATURE · Freeze-thawing · Summary of extreme temperature repeated test results

 

The panels are made of POSCO's high corrosion-resistant alloyed plated steel sheet (PosMAC 1.5), Fixed bracket and middle bracket contract with temperature · to hold the expansion work for which it is designed..


It is not a structure that freezes, melts repeatedly and splits like a film. 루프가드 패널 이음부 단면

Panel joint cross-section — bracket holds the panel and prevents deformation due to shrinkage · expansion with temperature

 

Winter is not the season for leaks.

While the snow melts and freezes repeatedly, the damage is rather large.


"Let's do it in the spring," before procrastinating, Is there a way to build it now? We encourage you to check it out first.

 

Owellsteel has been constructing apartments, government offices, and factory rooftops even in the middle of winter.


We'll take a look at the site conditions and weather to give you a timeline. Free on-site quote .

 